Emergency line, same number
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Oklahoma statewide
Auger boring (jack and bore) pushes steel casing in a straight line from a drive pit to a reception pit while spoil is removed mechanically. Carriers are grouted inside the casing on many railroad and highway templates.
Auger boring (jack and bore) pushes steel casing in a straight line from a drive pit to a reception pit while spoil is removed mechanically. Carriers are grouted inside the casing on many railroad and highway templates.
Shored pits are set on line and grade. Casing segments jack forward with a rotating cutting head. After the pipe is seated, product pipe or ducts are installed per agency spec.
Steel casing 12 inch through 72 inch and larger; internal HDPE, DIP, PVC, or multi-duct as designed.
Forty-foot neighborhood drives to five-hundred-foot agency crossings with intermediate jacking when engineered.
Jack and bore keeps pavement width intact on short, straight obstacles. Curved alignments or long HDPE pulls without casing usually shift scope to HDD.
Pit excavation exposes adjacent utilities — locates, shoring, and dewatering follow Oklahoma ROW rules and city shoring standards.
Casing size, drive length, pit depth, groundwater, rail or highway flagging, and welding inspection.
Get a Free Estimate →Shrink-swell clay, OG&E congestion, and ROW permits change the math — we scope before we mobilize.
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Send path, diameter, and county — we explain footage, rock, traffic control, and tap fees as drivers, not a menu price.
Oklahoma dig law, pothole conflicts, and expired tickets stop work — we document locates for commercial and municipal files.
Finished berms, brick walks, and tenant parking stay largely intact when HDD or casing fits the alignment.
Casing templates and straight alignments favor auger bore. Curved paths or long HDPE without casing favor HDD. We align with your engineer before quoting.
Often longer than the physical bore. Start BNSF or UP coordination early — we scope flagging and inspection holds in the quote.
Running sand and cobbles without dewatering can stall progress. Test pits and geotech reduce guesswork.
HDD uses a steerable drill head to create an underground path, then pulls pipe or conduit through without a continuous surface trench. It is the standard way to cross driveways, parking lots, highways, and waterways when restoration costs matter.
Quotes depend on footage, pipe size, red clay or rock, groundwater, traffic control, and how many utilities share the corridor — we do not publish a per-foot rate. Send your alignment and we will break down the cost drivers on a free estimate.
24/7 — Emergency dispatch statewide — (512) 838-3643
Scope your bore path
Step 1 of 2 — path, pipe, and city first