Emergency line, same number
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Oklahoma statewide
Steerable horizontal directional drilling places utilities on a designed underground alignment without stripping the surface above the path. A rig on your jobsite drills a pilot hole, opens it to pull diameter, and installs HDPE, steel, or conduit in one controlled operation.
Steerable horizontal directional drilling places utilities on a designed underground alignment without stripping the surface above the path. A rig on your jobsite drills a pilot hole, opens it to pull diameter, and installs HDPE, steel, or conduit in one controlled operation.
Directional Boring Oklahoma runs HDD statewide — from Nichols Hills driveway shots to ODOT relocations on I-35 and I-40.
Survey sets entry and exit. The drill string tracks on line and grade while mud stabilizes the hole. Reamers enlarge the bore; pullback tension is watched so pipe lands where your engineer specified. Crews pothole at locate conflicts before the bit moves.
SDR HDPE, PVC, DIP, steel casing, and multi-duct bundles — common range 1 inch through 24 inches; larger on engineered crossings.
Eighty-foot residential pulls to multi-thousand-foot trunk lines with night MOT on state highways.
When berms, pavers, or tenant access cannot be sacrificed, HDD often beats restoration math. Open pasture with nothing in the way may still favor trench — we say so after a walk-through.
Oklahoma One-Call tickets precede every pit. We document marks, hand-dig at conflicts, and do not drill on expired locates. ODOT and railroad addenda apply on ROW crossings.
Footage, diameter, clay versus rock, dewatering, traffic control, permit fees, utility density, and rig class — quoted as drivers, not a menu price.
Get a Free Estimate →Shrink-swell clay, OG&E congestion, and ROW permits change the math — we scope before we mobilize.
Line strike, main break, or permit window closing — dispatch answers 24/7 when locates and safe access allow.
Send path, diameter, and county — we explain footage, rock, traffic control, and tap fees as drivers, not a menu price.
Oklahoma dig law, pothole conflicts, and expired tickets stop work — we document locates for commercial and municipal files.
Finished berms, brick walks, and tenant parking stay largely intact when HDD or casing fits the alignment.
Cover follows utility spec — often 3–8 feet on distribution, deeper on crossings. Clay plasticity and groundwater drive entry angle and mud program.
Yes with appropriate tooling and mud. Central and southern Oklahoma rock lenses are planned for — not discovered mid-pull without a contingency.
Many driveway or yard shots finish in one to two days after valid locates. Rock, permits, or weather extend the window — we quote ranges, not guaranteed hours.
HDD uses a steerable drill head to create an underground path, then pulls pipe or conduit through without a continuous surface trench. It is the standard way to cross driveways, parking lots, highways, and waterways when restoration costs matter.
Quotes depend on footage, pipe size, red clay or rock, groundwater, traffic control, and how many utilities share the corridor — we do not publish a per-foot rate. Send your alignment and we will break down the cost drivers on a free estimate.
24/7 — Emergency dispatch statewide — (512) 838-3643
Scope your bore path
Step 1 of 2 — path, pipe, and city first